Skip to content
January Sale Is Live! | Click Or Call 833-658-3387

Downflow Install Kit CFSB17 for 17.5" Wide Gas Furnaces

By HVAC Store | Model: CFSB17
No Sales Tax - in most states excluding California
Free Shipping - on items over $1000
Satisfaction Guarantee - or return within 30 Days
Most Products In Stock - Call or Text (833) 658-3387 for availability
$699.00 + SHIPPING
DESCRIPTION

Downflow Install Kit for 17.5" Wide Gas Furnaces

The installation kit is crafted to provide necessary spacing between furnaces and the floor, ensuring safe installation of gas furnaces in the downflow orientation on wood flooring.

  • The CFSB17 is a crucial component of the installation kit, providing secure positioning for Goodman gas furnaces.
  • It enhances safety by ensuring proper spacing between the furnace and the wood flooring.
  • Specifically engineered to accommodate downflow orientation, guaranteeing optimal functionality and reliability.
PRODUCT SPECIFICATION TABLES
Brand The Duct Company Model # CFSB17
Configuration Upflow/Horizonta Burner Stages Single
Height 5" Width 19"
Depth 24"
Shipping

We ship freight to the 48 contiguous states, excluding Hawaii and Alaska. Some shipping restrictions may apply. Liftgate services may incur an additional fee, which can be added at checkout.

Order Processing: Orders are processed within 1-3 business days (excluding weekends). Orders placed on Fridays will be processed the next business day. Once shipped, you’ll receive an email confirmation with tracking details. Backordered products may have longer processing times, and we will notify you of any delays.

Arrival of Goods: Freight delivery times depend on the carrier's schedule and routing. Estimated delivery times are provided at checkout. The carrier will contact you to arrange delivery, and you must be present to sign for the shipment.

Damages: Upon delivery, inspect your shipment carefully for any damage or discrepancies. Note any issues on the carrier’s delivery receipt and notify us within 24 hours. Claims made after this timeframe may be denied. Photographic proof is required for processing claims. Report damages or discrepancies immediately at support@hvacstore.com.

Returns: For returns unrelated to damage, contact us at support@hvacstore.com for authorization. Return shipping costs are the customer’s responsibility, and a 20% restocking fee applies. Items must be in original packaging and condition for a refund.

Delivery Receipt: Before signing the delivery receipt, inspect the shipment for any damage. Your signature confirms acceptance of the delivery unless issues are noted.

Policy Updates: Our shipping policy may change, and updates will be communicated via our website or other channels. For any questions, contact The HVAC Store at support@hvacstore.com or call (833) 658-3387.

Reviews

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
Questions & Answers loading...

Our Real Customer Reviews

See what our customers have said about us.

DESCRIPTION

Downflow Install Kit for 17.5" Wide Gas Furnaces

The installation kit is crafted to provide necessary spacing between furnaces and the floor, ensuring safe installation of gas furnaces in the downflow orientation on wood flooring.

  • The CFSB17 is a crucial component of the installation kit, providing secure positioning for Goodman gas furnaces.
  • It enhances safety by ensuring proper spacing between the furnace and the wood flooring.
  • Specifically engineered to accommodate downflow orientation, guaranteeing optimal functionality and reliability.
PRODUCT SPECIFICATION TABLES
Brand The Duct Company Model # CFSB17
Configuration Upflow/Horizonta Burner Stages Single
Height 5" Width 19"
Depth 24"
Shipping

We ship freight to the 48 contiguous states, excluding Hawaii and Alaska. Some shipping restrictions may apply. Liftgate services may incur an additional fee, which can be added at checkout.

Order Processing: Orders are processed within 1-3 business days (excluding weekends). Orders placed on Fridays will be processed the next business day. Once shipped, you’ll receive an email confirmation with tracking details. Backordered products may have longer processing times, and we will notify you of any delays.

Arrival of Goods: Freight delivery times depend on the carrier's schedule and routing. Estimated delivery times are provided at checkout. The carrier will contact you to arrange delivery, and you must be present to sign for the shipment.

Damages: Upon delivery, inspect your shipment carefully for any damage or discrepancies. Note any issues on the carrier’s delivery receipt and notify us within 24 hours. Claims made after this timeframe may be denied. Photographic proof is required for processing claims. Report damages or discrepancies immediately at support@hvacstore.com.

Returns: For returns unrelated to damage, contact us at support@hvacstore.com for authorization. Return shipping costs are the customer’s responsibility, and a 20% restocking fee applies. Items must be in original packaging and condition for a refund.

Delivery Receipt: Before signing the delivery receipt, inspect the shipment for any damage. Your signature confirms acceptance of the delivery unless issues are noted.

Policy Updates: Our shipping policy may change, and updates will be communicated via our website or other channels. For any questions, contact The HVAC Store at support@hvacstore.com or call (833) 658-3387.

Reviews

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)